The production process of this customer needs regular cleaning and, therefore, is being interrupted regularly. This leads to two important challenges in designing the cogeneration installation: the need to easily switch from maximum power to zero, and a deeply modulated steam consumption. The solution lied in a turbine that can handle both at the same time: the GBP80D.